The makeover of Terminal 1 entrances that connect the Bag Claim level with Arrivals Drive at Lambert-St. Louis International Airport is moving to the second and final phase.

On Tuesday, Oct 1, Lambert will re-open Terminal 1 Entry/Exit 17 which has been renovated with new sleek, all-glass enclosed walkways. Entry/Exit 17 is the main exit for the passenger pick- up zone, car rental shuttles and hotel shuttles.

Also on Tuesday, Lambert will close Terminal 1 Entry/Exit 12 which will also be fully renovated with the same glass and steel architecture over the walkways. The second phase of construction will close one lane of traffic near the work zone.  The loading zone for Super Park shuttles and the Terminal 2 Shuttle, normally located on the curb of the terminal, will be moved to the center island on Arrivals Drive during construction. The project is slated to be completed in three to four months, weather permitting.

The new all-glass enclosed walkways will better enhance Lambert’s historic terminal architecture. The project is being funded with support from the Eastman Chemical Company. The glass panels will allow natural lighting to brighten the pathway for the public to and from the lower level Bag Claim. Eastman’s Saflex® and Vanceva® interlayers bring safety, security and UV protection to the laminated glass. LLumar® decorative window films provide a distinct design pattern to the enclosed walkways.