Active Alerts: 1
Advisory

There will be temporary lane closures on Lambert International Boulevard through early January due to on-going MetroLink inspections. Get more information.

MetroLink Inspections Will Create Intermittent Lane Closures on Lambert International Boulevard.

Posted on November 16, 2017 in Media Releases

Beginning November 15, bridge inspection work for the MetroLink rail system near Terminal 2 at St. Louis Lambert International Airport will create temporary lane reductions on Lambert International Blvd--the main roadway connecting the airport terminals.

Construction signs will be in place indicating the affected lanes for closure near Terminal 2, where the MetroLink line crosses over the roadway. Inspection of MetroLink structures will occur after the peak morning travel period between  7 a.m. to 2:30 p.m. 

MetroLink inspection work will occur intermittently through January 6, 2018.  The work will not be scheduled during the peak holidays periods including Thanksgiving week, Christmas week through the New Year.